Develop the mrp planning schedule


Discuss the following:

Utilizing the Step-by-Step MRP Calculation Process, students will solve the following MRP problem given: Product A is an end item and is made from two units of B and four of C. B is made of three units of D and two of E. Product C is made of two units of F and two of E. Product A has a lead-time of one week. Products B, C and E have lead-times of two weeks. Products D and F have a lead-time of three weeks.

a. Show the bill of material (product structure tree).

b. If 100 units of A are required , develop the MRP planning schedule, specifying when items are to be ordered and received.

There are currently no units of inventory on hand.

Criteria:

1. Student will demonstrate their relevant knowledge of MRP

2. Apply critical thinking in applying MRP concepts

3. Create an Master Production Schedule and a Material Requirement Planning Chart

4. If there is a positive net requirement, backward schedule by the lead-time and enter the quantity for the planned order release that will satisfy the net requirement.