Develop an aggregate production schedule


Assignment:

Shoney Video Concepts produces a line of video streaming servers that are linked to personal computers for storing movies. These devices have very fast access and large storage capacity.

Shoney is trying to determine a production plan for the next 12 months. The main criterion for this plan is that the employment level is to be held constant over the period. Shoney is continuing in its R&D efforts to develop new applications and prefers not to cause any adverse feelings with the local workforce. For the same reason, all employees should put in full workweeks, even if that is not the lowest-cost alternative. The forecast for the next 12 months is

MONTH FORECAST DEMAND     MONTH FORECAST DEMAND
  January 600     July 200
  February 800     August 200
  March 900     September 300
  April 600     October 700
  May 400     November 800
  June 300     December 900

Manufacturing cost is $200 per set, equally divided between materials and labor. Inventory storage cost is $5 per unit per month and is assigned based on the ending inventory level A shortage of sets results in lost sales and is estimated to cost an overall $20 per unit short. No backorders exist, meaning any unmet demand in one month is not carried over to the next month.

The inventory on hand at the beginning of the planning period is 200 units. Ten labor hours are required per videodisc player. The workday is eight hours.

Develop an aggregate production schedule for the year using a constant workforce. For simplicity, assume 22 working days each month except July, when the plant closes down for three weeks' vacation (leaving seven working days). Assume that total annual production capacity is greater than or equal to total annual demand (i.e., compute workforce level based on annual demand and annual capacity.