Develop a work breakdown structure


Assignment: An ‘Eye-Catching' Report

• Define the project objective(s) and list the assumptions about the project.

• Develop a work breakdown structure.

• Prepare a list of the specific activities that need to be performed to achieve the project objective(s).

• For each activity, assign the person who will be responsible.

• Create a network diagram that show the sequence and dependent relationships of all the activities.

Format your assignment according to the following formatting requirements:

(1) The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

(2) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

(3) Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Corporate Finance: Develop a work breakdown structure
Reference No:- TGS03048207

Now Priced at $40 (50% Discount)

Recommended (95%)

Rated (4.7/5)