Determine variable factory overhead controllable variance


Question - Roadmaster Tire Co. Manufactures automobile tires. Standard cost and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 5,500 tires were as follows.

                                          Standard Costs                                  Actual Cost

Direct materials                   82,000 lbs. at $5.10                          82,600 lbs. at $5.25

Direct labor                         1,650 hrs. at $17.50                          1,620 hrs. at $17.40

Factory Overhead                Rates per direct labor hr.

                                          Based on 100% of normal

                                          Capacity of 1,500 direct

                                          Labor hrs.

                                          Variable cost $3.10                          $5,000 variable cost

                                          Fixed cost $4.90                                $7,350 fixed cost.

Instructions -

Determine (a) the price variance, quantity variance, and total direct materials cost variance; (b) the rate variance, time variance, and total direct labor cost variance, and (c) variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Determine variable factory overhead controllable variance
Reference No:- TGS02613171

Now Priced at $25 (50% Discount)

Recommended (99%)

Rated (4.3/5)