Determine the flexible budget for variable overhead based


Cost Accounting flexible variables Assignment

One of your clients, Moore Manufacturing has asked you to assist them in evaluating their performance against their budgets. The management of Moore Manufacturing has provided the following standard cost sheet for one of its products:

Direct Materials

6 lb @ $2 per pound

$12

Direct Labor

3 hrs @ $25 per hr

$75

Variable factor overhead

2 hrs @ $4 per hour

$8

Fixed factory overhead

2 hr @ $15 per hour

$30

Cost per unit

 

$125

Moore Manufacturing applies factory overhead based on direct labor hours and factory overhead is allocated based on a practical capacity of 500 units of product.

The actual operating results for the year are as follows:

Units manufactured


400

Direct materials purchased and used

1,800 pounds

$19,800

Direct labor incurred

750 hours

20,250

Variable factory overhead incurred


5,000

Fixed factory overhead incurred


15,800

Determine the following for the period:
Flexible budget for variable overhead based on output for the period
Total variable overhead applied to production during the period
Total budgeted fixed factory overhead
Total fixed factory overhead applied to production during the period
Calculate the following variances using four-variance analysis:
Total variable overhead variance
Variable overhead spending variance
Variable overhead efficiency variance
Total under applied or over applied variable overhead
Fixed overhead spending variance
Production volume variance
Total fixed overhead variance
Total under applied or over applied fixed overhead
Calculate the following variances using three-variance analysis:
Factory overhead spending variance
Factory overhead efficiency variance
Production volume variance.

Solution Preview :

Prepared by a verified Expert
Financial Accounting: Determine the flexible budget for variable overhead based
Reference No:- TGS02178407

Now Priced at $45 (50% Discount)

Recommended (95%)

Rated (4.7/5)