Define the tendering process with specific reference to


Project Risk, Procurement and Quality Management Post-workshop Assignment

Assignment description

The workshop for this subject has introduced several tools and frameworks that can be used to manage issues related to project management. The topics that were included in the block workshop broadly included quality, risk and procurement management and how these relate to the delivery of successful projects.

Please choose two (2) out of the three (3) topics below and answer the associated questions. The topics are weighted equally. You will find further information regarding the weighting of individual questions in the respective sections.

Choose two topics out of three.

Topic 1: Risk Management

Assuming that you are working for the Wembley National Stadium Ltd (WNSL), identify any six (6) key stakeholders to the WNSL. The six key stakeholders must include at least two (2) subcontractors and one (1) bank or financial institution. Refer to the presentations from the course and develop a suitable risk matrix and complete the following:

i. Identify the risks (with details of causes and consequences) related to the key stakeholders that you have identified above.

ii. Assess the probability (likelihood) of occurrence, the potential consequences, and the resultant risk rating (based on your risk criteria) if no mitigating measures are established / implemented.

iii. For each of these risks, indicate what mitigating (control) measures should be instituted in order to reduce the likelihood of occurrence and the severity of the consequences.

iv. Re-assess the likelihood of occurrence, the potential consequences and the revised risk rating in view of these measures (i.e. effectively establish and assess the residual risks).

Note that in filling out the columns of the risk matrix, you would have answered (i) to (iv). The final question below (v) is not listed on the risk matrix, and needs to be answered separately.

v. In your opinion, which of these risks would be better assessed using a more quantitative risk tool e.g. Monte Carlo? Briefly explain your answer.

Topic 2: Procurement Management

A major difference to business as usual for Multiplex was that they had to deliver the Wembley Stadium in the UK and not in Australia, i.e. they were delivering the project in a different jurisdiction. A key challenge for Multiplex was thus to secure the services of suitably qualified and capable local sub-contractors for the supply of services, materials and equipment.

From the performance of Multiplex and key sub-contractors it is clear that their relationship was not optimal in delivering the outcomes as required by WNSL. In providing a tender submission to WNSL, Multiplex had to engage with their sub-contractors prior to submitting their own proposal for the Design and Construction of the stadium. In preparing their own submission assume that Multiplex conducted their own tenders for the various work packages.

One of the key packages of work was for the design, supply and installation of the steelworks. Assuming that you are working for Multiplex and the project is in its early stages, you have been tasked to assist with the tendering process to secure the services of a suitably qualified and experienced company to provide the necessary materials and services. For the tendering of the steelwork you have specifically been asked to:

i. Define a procurement strategy (as comprehensive as you deem necessary) to engage the relevant sub-contractor (through a selective tendering process);

ii. Define the tendering process, with specific reference to your evaluation criteria (and weightings) to identify the most suitable sub-contractor; and

iii. Define the key performance metrics that you will incorporate in your contract. Multiplex will use these metrics to measure the performance of this subcontractor. You also need to illustrate how and when, Multiplex - as the prime contractor - will provide visibility to WNSL of the performance of their sub-contractors.

Topic 3: Quality Management

Assuming that you are working for Multiplex and the project is in its early stages, you have been tasked to develop a quality management plan and complete the following:

i. Identify (at least five) quality parameters and expected levels of quality for project deliverables. To complete this task, please consider carefully what the deliverables are from Multiplex;

ii. Propose (at least two for each quality parameters) quality control measures as well as workflow processes/steps that will be used during deliverable preparation;

iii. Propose a process for submittal of deliverables to the WNSL, expected quality checking to be performed by the WNSL, and workflow processes/steps for documenting acceptance and rejection of deliverables.

Assignment Files -

https://www.dropbox.com/s/oto202j411hlnir/Case%20Study%20-%20Assignment%20Files.rar?dl=0

Request for Solution File

Ask an Expert for Answer!!
Management Theories: Define the tendering process with specific reference to
Reference No:- TGS02474983

Expected delivery within 24 Hours