Conceptual data modeling is typically done in parallel with


Question 1. Conceptual data modeling is typically done in parallel with other requirements analysis and structuring steps during
systems planning and selection.

systems design.
systems analysis.
systems implementation and operation.
systems evaluation.

Question 2. On an entity-relationship diagram, a rectangle represents a(n)

data flow.
entity.
multivalued attribute.
repeating group.
relationship.

Question 3. A collection of entities that share common properties or characteristics best defines

entity type.
entity instance.
entity occurrence.
entity collection.
data set.

Question 4. An attribute (or combination of attributes) that uniquely identifies each instance of an entity type defines
data element occurrence.

trigger.
candidate key.
associative entity.
data marker.

Question 5. A relationship between the instances of one entity type is a

unary relationship.
binary relationship.
ternary relationship.
singular occurrence.
partnership occurrence.

Question 6. A relationship between instances of two entity types is a

unary relationship.
binary relationship.
ternary relationship.
multiple occurrence.
partnership occurrence.

Question 7. A relationship that the data modeler chooses to model as an entity type best defines

recursive relationship.
associative entity.
domain.
complex relationship.
complex entity.

Question 8. During which of the following steps will you bring the current phase to a close, prepare a report and presentation to management concerning continuation of the project, and get ready to move the project into design?

Designing the human interface
Requirements determination
Project initiation and planning
Alternative generation and selection
Requirements structuring

Question 9. Enumerating different potential implementation environments that could be used to deliver the different sets of capabilities occurs during the

requirements structuring step of the analysis phase.
alternative generation and selection step of the analysis phase.
testing step of the implementation and operation phase.
project initiation and planning step of the planning and selection phase.
designing the human interface step of the design phase.

Question 10. A good number of alternatives to generate is

three.
two.
four.
five.
seven.

Request for Solution File

Ask an Expert for Answer!!
Database Management System: Conceptual data modeling is typically done in parallel with
Reference No:- TGS01062723

Expected delivery within 24 Hours