Concept of trade-off in the project environment


Assignment:

As the project manager, you have been tasked to assemble a presentation that will apply knowledge acquired in prior assignments to explain how trade-offs can be made between various project requirements to promote cost control of the project's total cost. This presentation is for your team assigned to this project, as they have been asking questions related to trade-offs to control costs. You will be deducing how estimating, pricing, cost controls and time value of money can be measured and weighed to perform a trade-off analysis.

Develop a presentation that will analyze the concept of trade-off in the project environment. You will have to design from research or experience the example and then build the presentation around the example. Your analysis might include topics such as methodology for trade-off analysis, contracts, and industry preferences.

Create a PowerPoint slide set or MS MovieMaker project creating a presentation. Think about who your target audience is and how your topic affects them.

The required length of the PowerPoint Presentation option for this assignment is 12 to 15 slides (with a separate reference slide). Your presentation MUST include speaker notes at bottom containing 100 to 150 words per slide (this is your script). Be sure to include citations for quotations and paraphrases with references in APA format and style. Save the file as a PPT file with the correct course code information in the name.

 

Solution Preview :

Prepared by a verified Expert
Other Management: Concept of trade-off in the project environment
Reference No:- TGS01871730

Now Priced at $110 (50% Discount)

Recommended (98%)

Rated (4.3/5)