Computing all of the labor variances


Response to the following problem:

Buil Corporation manufactures a single product. The standard cost per unit of product is as follows.

Direct materials-2 pounds of plastic at $6 per pound .................$12

Direct labor-2 hours at $13 per hour ......................................26

Variable manufacturing overhead ............................................7

Fixed manufacturing overhead ...............................................5

Total standard cost per unit .................................................$50

The master manufacturing overhead budget for the month based on normal productive capacity of 20,000 direct labor hours (10,000 units) shows total variable costs of $70,000 ($3.50 per labor hour) and total fixed costs of $50,000 ($2.50 per labor hour). Normal productive capacity is 20,000 direct labor hours. Overhead is applied on the basis of direct labor hours. Actual costs for November in producing 9,700 units were as follows.

Direct materials (20,000 pounds) .....................$119,000

Direct labor (19,600 hours) ..............................256,760

Variable overhead ..........................................68,800

Fixed overhead .............................................50,000

Total manufacturing costs ..............................$494,560

The purchasing department normally buys the quantities of raw materials that are expected to be used in production each month. Raw materials inventories, therefore, can be ignored.

Instructions:

(a) Compute all of the materials and labor variances.

(b) Compute the total overhead variance.

Solution Preview :

Prepared by a verified Expert
Cost Accounting: Computing all of the labor variances
Reference No:- TGS02074571