Compute the overhead rate using the traditional plantwide


Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use a plantwide overhead rate based on direct labor costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company's operations.

Standard

Custom

Direct labor costs$60,000$120,000

Machine hours1,3001,140

Setup hours107420

Total estimated overhead costs are $296,000. Overhead cost allocated to the machining activity cost pool is $198,000, and $98,000 is allocated to the machine setup activity cost pool.

Compute the overhead rate using the traditional (plantwide) approach. (Round answer to 2 decimal places, e.g. 12.25.)

Predetermined overhead rate ..............................% of direct labor cost

Compute the overhead rates using the activity-based costing approach. (Round answers to 2 decimal places, e.g. 12.25.)

Machining$ ..................... per machine hour
Machine setup $..............per setup hour

Determine the difference in allocation between the two approaches. (Round answers to 0 decimal places, e.g. 1,225.)

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Compute the overhead rate using the traditional plantwide
Reference No:- TGS02598667