Communication between engineering and production a critical


"Communication Between Engineering and Production: A Critical Factor" discusses cost and benefit tradeoffs of design changes. A small design change of a product may enhance a product in ways such as cost or weight, but also may result in increased manufacturing, maintenance, loss of inventory, and loss of quality. For a small design change of a product that you are aware of, such as going from a metal to a plastic part on a product, discussing the cost and benefit tradeoffs from both the design viewpoint and the production viewpoint, considering documentation costs. It also discusses the importance of communication and cooperation between engineering design and engineer production such that optimum products can get to market quickly. Stages of the design-production process are described which include design, prototype, pilot, and production, as well as the design freeze cut-off point whence the design is formally frozen. Engineering documentation, which includes drawings, bills of material, schematics, and assembly prints, is a form of engineering communication that is costly to initially create as well as to maintain, so must be judiciously generated. Bills of material must be complete for effective inventory control and planning. Changes to a product will always include both benefits and costs, thus must be thought through carefully before implemented.

Questions

What is value engineering? Give an example.

What is the fundamental characteristic of the design freeze point?

When is highly detailed documentation required?

What are the costs involved with obsolete inventory?

Why is it judicious to batch engineering change requests?

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Communication between engineering and production a critical
Reference No:- TGS02937758

Expected delivery within 24 Hours