Calculate the projects expected npv


Assignment

What are the project's expected NPV, standard deviation, and coefficient of variation?

Madison Manufacturing is considering a new machine that costs $350,000 and would reduce pre-tax manufacturing costs by $110,000 annually. Madison would use the 3-year MACRS method to depreciate the machine, and management thinks the machine would have a value of $33,000 at the end of its 5-year operating life. The applicable depreciation rates are 33.33%, 44.45%, 14.81%, and 7.41%, as discussed in Appendix 11A. Working capital would increase by $35,000 initially, but it would be recovered at the end of the project's 5-year life. Madison's marginal tax rate is 40%, and a 10% cost of capital is appropriate for the project.

a. Calculate the project's NPV, IRR, MIRR, and payback.

b. Assume management is unsure about the $110,000 cost savings-this figure could deviate by as much as plus or minus 20%. What would the NPV be under each of these extremes?

c. Suppose the CFO wants you to do a scenario analysis with different values for the cost savings, the machine's salvage value, and the working capital (WC) requirement. She asks you to use the following probabilities and values in the scenario analysis

Scenario         Probability          Cost Savings          Salvage Value         WC
Worse case         0.35                   $88,000                  $28,000             $40,000
Base case           0.35                   110,000                  33,000               35,000
Best case            0.35                   132,000                   38,000             30,000

Calculate the project's expected NPV, its standard deviation, and its coefficient of varia- tion. Would you recommend that the project be accept.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Financial Management: Calculate the projects expected npv