Calculate the overhead cost per unit


Case Scenario:

A company produces two types of leather purses: standard and handcrafted  Both purses use equipment for cutting and stitching.  The equipment also has the capability of creating standard designs. The standard purses use only these standard designs. They are all of the same size to accommodate the design features of the equipment. The handcrafted purses can be cut to any size and because the designs are created manually. Many of the manually produced designs are in response to specific requests of retailers. The equipment must be specially configured to accommodate the production of a batch of purses that will receive a handcrafted design. The company assigns overhead using direct labor dollars.  The sales manager is convinced that the purses are not being costed correctly.      

To illustrate his point, the sales manager decided to focus on the expected annual setup and machine related costs, which are as follows:
    
Setup equipment      $18,000

Depreciation             $20,000

Operating Costs        $22,000

Computed on a straight-line basis, book value at the beginning of the year was $100,000.  The machine has the capability of supplying 100,000 machine hours over it’s remaining life.

The sales manager also collected the expected annual prime costs for each purse, the machine hours, and the expected production (which is the normal output for the company).

The details are:
                             Standard Purse          Handcrafted Purse

Direct labor                 $12,000                      $36,000

Direct Materials            $12,000                      $12,000

Units                              3000                            3000

Machine hours              18,000                           2,000

Number of setups                40                               40

Setup time                   400 hours                  200 hours

Questions to answer:

Question 1: The controller has suggested that overhead costs be assigned to each product using a plantwide rate based on direct labor dollars.  Machine costs and setup costs are overhead costs.  Assume that these are the only overhead costs.  For each type of purse, calculate the overhead per unit that would be assigned using a direct labor dollars overhead rate.

Question 2: Calculate the overhead cost per unit per purse using two overhead rates: one for the setup activity and one for the machining activity.  In choosing a driver to assign the setup costs, use number of setups for one and use number of setup hours for another.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Calculate the overhead cost per unit
Reference No:- TGS01739584

Now Priced at $20 (50% Discount)

Recommended (92%)

Rated (4.4/5)