Calculate the direct materials cost variances


The Rio Company manufactures beach umbrellas and uses a standard cost system. An analysis of costs shows the direct material used in one umbrella costs $10.20. One hour of direct labor costs $12 with standard production being two umbrellas per hour. Variable manufacturing overhead is estimated at $4.50 per hour, and fixed overhead is set as $72,000 per year. Normal operating capacity is 120,000 umbrellas per year.

1.Determine the standard variable cost per umbrella based on the above information.

  • During the year 110,000 umbrellas were produced at the following costs:
  • Materials (114,000 units @ $10.50) $ 1,197,000
  • Labor (62,000 hours @ $11.80) 731,600
  • Variable overhead 285,200
  • Fixed overhead 72,000 (don't need for these calcs)

2.Calculate the direct materials cost variances, the direct labor cost variances, and the variable overhead cost variances.

Request for Solution File

Ask an Expert for Answer!!
Accounting Basics: Calculate the direct materials cost variances
Reference No:- TGS0706620

Expected delivery within 24 Hours