Assuming the machine model of Example 10.6 (as in Exercise 10.3.2):

2124_code (2).png

a) Draw the data dependence graph for the code of Fig. 10.11.

b) What are all the critical paths in your graph from part (a)?

c) Assuming unlimited MEM resources, what are all the possible schedules for the seven instructions?