Response to the following problem:
Imagine two agents (e.g., regions of a certain country, being separated by a river) provide financial resources to construct a bridge connecting both riversides.
The corresponding construction costs are c = 1; the  following mechanism of costs allocation is used.  Each  agent reports the estimate si  of his or her "income"  hi resulting from bridge operation. Construction of the bridge is authorized only if s1  + s2  ≥  c.