Activity-based costing batch-level variance analysis


Question: Activity-based costing, batch-level variance analysis. Audrina's Fleet Feet, Inc., produces dance shoes for stores all over the world. While the pairs of shoes are boxed individually, they are crated and shipped in batches. The shipping department records both variable direct batch-level costs and fixed batch-level overhead costs. The following information pertains to shipping department costs for 2017.

114_142.png

1. What is the static budget number of crates for 2017?

2. What is the flexible budget number of crates for 2017?

3. What is the actual number of crates shipped in 2017?

4. Assuming fixed overhead is allocated using crate-packing hours, what is the predetermined fixed overhead allocation rate?

5. For variable direct batch-level costs, compute the price and efficiency variances.

6. For fixed overhead costs, compute the spending and the production-volume variances.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Activity-based costing batch-level variance analysis
Reference No:- TGS02459994

Now Priced at $15 (50% Discount)

Recommended (92%)

Rated (4.4/5)