Acc 200- calculate the product cost per unit for the basic


Assignment: INTRODUCTION TO MANAGEMENT ACCOUNTING GROUP ASSIGNMENT

The Genre company is the manufacturer of two products the Basic and the Advanced .Details of production data and product cost data are as follows:

                                        Basic               Advanced
Direct material                    40                  60
Direct labour                      2 hours           3 hours
Manufacturing overhead      2 hours           3 hours
Direct labour cost per hour  $15 per hour   $15 per hour
Production                         2000 units       10000 units

Manufacturing overhead has traditionally used direct labour hours to calculate the predetermined overhead rate.

The Manufacturing overhead budget is as follows:

Set up costs                   $360,000
Engineering costs            180,000
Machine related costs       900,000
Plant related costs           192,000
Total                              $1,632,000

The Genre company has traditionally priced its products at120 per cent of manufacturing cost .

Recently the Genre company has found it has had difficulty selling its advanced product with a competitor entering the market from overseas and making substantial sales at a price considerably below Genre's price for the Advanced product .

The CEO of Genre ,Jane Monk, cannot understand how this could be and has asked you to investigate the matter.You start to examine some of the data and decide to check out a new approach to allocate costs called Activity Based Costing .You have managed to identify the following information:

Activity Cost Pool              Cost Driver                               Budgeted level of Cost Driver
Set up costs                     Number of production runs        80 runs
Engineering costs              Engineering changes                 200 engineering changes
Machine related costs         Machine hours                          18,000 hours
Plant related costs             Floor space in sqft                    3,840 sqft

In addition the following information has been determined :

--The Basic product is manufactured in production runs of 50 units each and the Advanced product is manufactured in 250 unit batches
--75% of the engineering changes are used by the Basic product with the remaining 25% used by the Advanced product
--Each Basic product requires 4 machine hours whereas each Advanced product requires 1 machine hour
--The plant has 3,840 square feet of floor space with 80% of it used in the production of the Basic product

Required:

Using the information above and your knowledge of Activity Based Costing you are required to provide answers to the following :

(a) Calculate the predetermined overhead rate that would be used under traditional overhead costing
(b) Calculate the product cost per unit for the Basic and Advanced products under traditional costing
(c) Calculate the price that would be charged for the Basic and the Advanced products under traditional costing
(d) Calculate the cost per Activity for each cost pool.
(e) Calculate the cost per unit for Basic and Advanced products using Activity Based Costing
(f) Based on your calculations with respect to Basic and Advanced products comment upon whether either product has been overcosted or undercosted
(g) Discuss the benefits that can be obtained from using an Activity Based Costing system and whether it would be useful in costing the current products.

Solution Preview :

Prepared by a verified Expert
Managerial Accounting: Acc 200- calculate the product cost per unit for the basic
Reference No:- TGS02161249

Now Priced at $40 (50% Discount)

Recommended (97%)

Rated (4.9/5)