Raking piles of a bridge abutment to be placed
Why should not raking piles of a bridge abutment to be placed under an embankment?
Expert
The movement between the ground and the pile group is difficult to predict for a bridge abutment to be maintained on raking piles with different orientations. The settlement of embankment behind the abutment may result the raking piles to go through harsh bending moment and harm the piles if some of the bridge raking piles abutment are extended beneath an embankment.
Write short note on Cavitation.
what is the application of dynamic probe light in geotechnical engineering
Gravity flow: Gravity flow is a fluid flowing due to the forces of gravity alone and not to the applied pressure head. In Bernoulli’s equation, the pressure word is absent, and the height and velocity terms are only ones involved.
List the various objectives of surveying.
How the surveying is being categorized on the basis of the instruments used?
Define the term Isothermal Efficiency of Air Compressor.
List the types of surveying.
Explain the importance of delay period in the CI engine combustion phenomena?
State the phenomenon of Super Saturated Expansion in steam nozzle.
What is by Forced Circulation Boiler? What is the pressure at which the modern high pressure boilers produce steam?
18,76,764
1938960 Asked
3,689
Active Tutors
1429496
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!