Mpm 521 project planning integration scope management


Project Planning, Integration & Scope Management Assignment

1) We discussed types of project life cycles such as iterative, incremental, adaptive, and others. In your own words, explain when each one should be used, and give example of project that could use each type.

2) Using the following paper format, do your own search, and investigate different schedule delay analysis methods introduced in industry & research.

Schedule Delay Analysis Techniques in Industry & Research

Abstract: Not more than 150 words.

Keyword

1. Introduction

2. Literature Review

3. Research Objective

4. Schedule Delay Analysis in Industry

5. Schedule Delay Analysis in Research

6. Conclusions

7. References

The assignment is to write report which is consist of two parts:

Part 1: Lifecycles, (Explanation of each one and example of project that could use each type).

The lifecycles are: Single Phase project, three phase project, project with overlapping phases, Predictive lifecycle, Iterative and Incremental Lifecycles, and Predictive Lifecycle.

Part 2: Schedule Delay Analysis in Industry (means which are already used), Schedule Delay Analysis in research (means there are researches about them but they are not applied yet) There should be three Schedule Delay Analysis on each of them. They should not be Windows Analysis or Contemporaneous Period Analysis, Time Impact Analysis (TIA), Collapsed As-Built, Impacted As-Planned or As-Planned vs. As-Built.

Solution Preview :

Prepared by a verified Expert
Project Management: Mpm 521 project planning integration scope management
Reference No:- TGS02785906

Now Priced at $45 (50% Discount)

Recommended (94%)

Rated (4.6/5)