List components of planning sequences for project planning


Assignment: Fundamentals Of Project Management

Planning the Project

The PMBOK Guide states that the planning process includes actions necessary to define, integrate, and coordinate all subsidiary plans into a project management plan. This implies that in bottom-up planning, the summary project plan being the consolidation of subsidiary plans is drawn independently.

Based on your understanding of the project planning process, answer one of the following bullet points:

• Is bottom-up planning appropriate or should the project plan be developed top-down by developing the subsidiary plans based on the documentation (charter and scope statement) that has been produced to this point? Explain. Is there any other approach you would recommend?

• List the nine components of planning sequences for software project planning. Any successful project plan must contain nine key elements. List these items and briefly describe the composition of each.

• Describe the "even planning process" and explain why it is helpful. What is shown on a linear responsibility chart? How is it useful to a project manager? In what ways may the WBS be used as a key document to monitor and control a project?

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: List components of planning sequences for project planning
Reference No:- TGS02955806

Now Priced at $30 (50% Discount)

Recommended (94%)

Rated (4.6/5)