How is the water cube project structured


Assignment: Navigating the Structural and Cultural Aspects of a Project

For this Assignment, read "Lessons Learned from Managing the Design of the ‘Water Cube' National Swimming Centre for the Beijing 2008 Olympic Games" [Zou, P. X. W., & Leslie-Carter, R. (2010)].

Analyze the structure of the Water Cube project team in the context of the three common types of organizational structures and the cultural aspects of the project. Prepare a 3-page paper that addresses these items:

• How is the Water Cube project structured?
• What are some of the benefits of the organizational structure of the Water Cube project team?
• What are some of the challenges of the team structure?
• What skills can the project manager use to manage the cultural aspects of the project?
• In what ways can project management practices help overcome these challenges?

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Attachment:- Resources.rar

Solution Preview :

Prepared by a verified Expert
HR Management: How is the water cube project structured
Reference No:- TGS02954875

Now Priced at $35 (50% Discount)

Recommended (93%)

Rated (4.5/5)