Develop a proposed schedule for the ra process


Project Assignment: Risk Assessment Plan

After creating an initial draft of the risk management plan, the second part of the assigned project requires you to create a draft of the risk assessment (RA) plan. To do so, you must:

1. Develop an introduction to the plan explaining its purpose and importance.

2. Create an outline for the RA plan.

3. Define the scope and boundaries for the RA plan.

4. Research and summarize RA approaches.

5. Identify the key roles and responsibilities of individuals and departments within the organization as they pertain to risk assessment.

6. Develop a proposed schedule for the RA process.

7. Create a professional report detailing the information above as an initial draft of the RA plan.

Evaluation Criteria and Rubrics

• Did the student demonstrate an understanding of the competencies covered in the course relating to risk assessments?
• Did the student include all important components of a RA plan in the outline?
• Did the student demonstrate good research, reasoning, and decision-making skills in identifying key components and methodologies?
• Did the student create a professional, well-developed draft with proper grammar, spelling, and punctuation?

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Risk Management: Develop a proposed schedule for the ra process
Reference No:- TGS02991625

Now Priced at $30 (50% Discount)

Recommended (93%)

Rated (4.5/5)