Describe the methodology behind constructing one


Assignment: VoIP: (Work Breakdown Structure)

This assignment contains two deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview

As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company's campus. The campus consists of three different buildings, each with twenty to fifty workstations. The project must be completed in ninety calendar days starting on November 1.

Deliverable: Summary (MS Word or open source equivalent)

1. Write a one to two page summary document in which you:

a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

b. Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

2. Use Microsoft Project to create a WBS which:

a. Contains at least five main tasks, one for each of the PMBOK process areas.

b. Contains at least sixty line items distributed in ten or more work packages.

c. Contains Work Breakdown Structure Code for each task.

d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

The specific course learning outcomes associated with this assignment are:

• Identify how project management improves the success of information technology projects.
• Explain the relationship of the scope of a project to the work breakdown structure.
• Use technology and information resources to research issues in IT project management.
• Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Solution Preview :

Prepared by a verified Expert
Management Information Sys: Describe the methodology behind constructing one
Reference No:- TGS02965723

Now Priced at $35 (50% Discount)

Recommended (91%)

Rated (4.3/5)