Software Development V-Model
What do you mean by Software Development V-Model? Illustrate in brief.
Expert
Most of the process models presently used can be more usually joined by the V-model where the ‘V’ signifies the graphical arrangement of the individual phases. The ‘V’ is as well a synonym for verification and validation.
The model is much simple and simple to understand. By ordering of actions in the time sequence and with abstraction levels the connection connecting development and test activities becomes apparent. Oppositely laying actions complement one other that is, serve as the base for test activities. Therefore, for illustration, the system test is taken out on the basis of the outcomes specification phase. The coarse view of model provides the impression that the test activities first start after the implementation. However, in the description of the individual actions, the preparatory work is generally listed. Therefore for illustration, the test plan and test strategy must be worked out instantly after the definition of the requirements. Nonetheless it can contribute very well to the structuring of software development method.
Briefly describe the reasons behind to function the white box testing?
How exception handling has changed in .NET Framework 4.0?
What are the different approaches for the integration testing? Illustrate in brief.
What is the main aim of time-line chart? Briefly describe the aim.
The model which supposes that the effort and development time is functions of product size alone is the: (1) Intermediate COCOMO model (2) Basic COCOMO model (3) Detailed COCOMO model (4) All three COCOMO models. Can someone please
Can someone please help me in finding out the accurate answer from the following question? The Hallway Page is mainly employed to which of the given options explains the appropriate meaning of the Mouse Trapping: (
Write down the brief explanation of all elements in the activity diagrams?
What do you mean by Quality Center (or Test Director)?
What is the meaning of the term calibration?
Describe in brief the various elements of the collaboration diagram?
18,76,764
1930194 Asked
3,689
Active Tutors
1459964
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!