Describe the Baseline criteria in the SCM

Briefly describe the Baseline criteria in the SCM?

E

Expert

Verified

a) Help to control the modifications.

b) Specification or product which has been formally reviewed and agreed on serves as the basis for future growth.

c) That can be modifying only via formal change control procedures.

   Related Questions in Software Engineering

  • Q : Attribute of software engineering Can

    Can someone please help me in finding out the accurate answer from the following question. Which of the given below is not the attribute of software engineering: (i) Efficiency. (ii)  Usability. (iii) Dependability. (iv) Scalability.

  • Q : Definition of Software How can I solve

    How can I solve my above Software Engineering problem? Please suggest me the accurate answer from the following. The software comprises of: (1) Set of instructions + operating procedures. (2) Programs + documentation + operating procedures. (3) Programs + hardware man

  • Q : Evolutionary Development Model I have a

    I have a problem in Software Engineering on Evolutionary Development Model. Please help me in the following question. The model in which the needs are implemented by the classification is: (1) Evolutionary Development Model (2) Iterative Enhancement M

  • Q : Spiral model of software development I

    I have a problem in Software Engineering on Spiral model of software development. Please help me in the following question. Spiral model of the software development: (1) Ends with the delivery of software product. (2)  Is more chaotic than increm

  • Q : Communicational cohesion problem Can

    Can someone help me in finding out the right answer from the given options. Modules X and Y operate on similar input and output data and then the cohesion is: (1) Procedural (2) Communicational (3) Sequential (4) Logical.

  • Q : Computer based system Define briefly

    Define briefly the term computer based system.

  • Q : Activity-Sequence Diagram Illustrate

    Illustrate the difference between Activity and Sequence Diagram.

  • Q : What do you mean by the term software

    What do you mean by the term software testing?

  • Q : Testing strategies or policies for the

    What are the different testing strategies or policies for the conventional software?

  • Q : Umbrella activities or actions of the

    Describe in brief the umbrella activities or actions of the software process?