Define Work Breakdown Structure or WBS

Work Breakdown Structure (WBS):
A) Defines each and every element of the project in a hierarchical framework

B) Helps with accountability:

  • facilitates the setting (and, later, the evaluation) of cost, time of quality performance targets at all levels in the organization.

C) Needs to integrate with the organization (structure and processes)

D) Forms the basis of coding of project elements and work packages

  • (e.g. 1; 1.1; 1.1.2; 1.1.2.5; etc)

   Related Questions in Biology

  • Q : Morphological feature of molluscs

    Describe the morphological feature of molluscs subsequent to which the phylum is named? Answer: The term “mollusc” means “soft thing”. Mollus

  • Q : Characteristics or Nature of

    Characteristics or Nature of Organization The various characteristics of organization are: 1 Division of labour:

  • Q : Force field analysis Define the term

    Define the term force field analysis and discuss why it is important for managers to understand this term when dealing with organizational change?

  • Q : Type-I diabetes mellitus and type-II

    State differences between type I diabetes mellitus and type II diabetes mellitus?

  • Q : Red and White blood cells State the

    State the difference between the red and white blood cells? What is meant by the term leukocytes?

  • Q : Describe the grave disease Describe the

    Describe the grave’s disease? Explain how it is characterized?

  • Q : How Individuals Behave - Organizational

    They behave differently to different stimuli because of a multitude of factors. These include an individual's age, sex, education, intelligence, personality, physical characteristics, experience, values, and family and cultural background. For instance, a young railway ticket collector would beha

  • Q : Bio-diverse ecosystems Explain some of

    Explain some of the economic applications which may be produced by very bio-diverse ecosystems.

  • Q : Problem with not paying market-driven

    Colleges & universities frequently do not pay salaries that are market-driven. For instance, it is typical for a history professor to make the similar as an economics professor. What types of problems are likely to result from this type of a pay scale?

  • Q : Size of some cephalopods related to the

    How large size of some cephalopods related to the type of circulatory system they present?