--%>

Assistance with a quiz

I have a quiz in Micro (below) can you assist by Saturday? An insulation plant makes three types of insulation (types B, R and X). Each is produced on the same machine which can produce any mix of output so long as the daily total weight is no more than 70 tons. The insulation is shipped in trucks from the company loading dock which can process a maximum of 30 trucks per day. The trucks can carry any mix of types B, R and X insulation. A truckload of type B, R and X insulation weighs 1.4 tons, 2.8 tons and 1.9 tons respectively. The insulation carries a flame retarding spray that is currently in short supply and only 75 cans of the spray are available daily. A truckload of type B insulation requires 3 cans of the spray, type R requires 1 can per truckload and type X requires 2 cans per truckload. Demand for each type of insulation is very strong and the company anticipates no problem selling the plant’s entire output. The contribution margin for type B insulation is $1,425 per truckload, whereas for types R and X insulation, the contributions are $1,800 and $1237.50 per truckload, respectively. The company is interested in determining how much of each insulation type it should produce. A. Develop the linear programming formulation for the above problem. Make sure you define and label your variables, clearly show the objective function and the relevant constraints in their algebraic form. (30 points) B. Translate the above into a Solver formulation of the linear programming problem and solve it. Attach the spreadsheets showing the formulations, the answer report, sensitivity report and limits report. (40 points) C. Describe the optimal production policy: (40 points) 1. How much of each insulation type (B, R and X) should be produced? 2. Identify and the slack and binding constraints at the optimal production level. 3. What is the total contribution at this production level? D. Use the appropriate reports from the Solver output to answer the following questions. (60 points) 1. What would you be willing to pay for (i) an extra unit of machine time, (ii) an extra unit of loading dock capacity and (iii) an extra canister of flame retarding spray? Explain your reasoning. 2. Suppose the machine needs downtime for preventive maintenance that will reduce its daily total output by 10%. How will this affect your answers to Part C? Explain your reasoning. 3. Is a likely improvement in the availability of flame retarding spray (10 extra cans per day) affect your answer to Part C? Explain your reasoning. E. The price of type X insulation has increased by $250 per truckload due to demand stemming from a new application. How will this change your answer to Part C? Explain your answer. (30 points) Q2. (200 points) Chuck Raverty is the managing partner of a small boutique consulting firm in which he has four senior partners available to work on four current projects for during the coming month. Chuck has assessed the fit between the skill levels of his colleagues relative to each of the four projects and has rated them on a 0-100 scale. Not surprisingly, the ratings are all fairly high, but there still are significant differences in the quality of fit. The following is a table of the ratings that he has developed: Partner Project 1 2 3 4 Alan 90 80 25 50 Charlie 60 70 50 65 David 70 40 80 85 Robert 65 55 60 75 Time 140 100 170 70 The last row of the table shows Chuck’s assessment of the time that it will take to complete each of the four projects. A. Assume that each partner will be assigned only to one project. What is the assessment of partners to projects that will maximize the sum of the assigned quality scores? Develop and write down the formal mathematical statement of the problem. (40 points). B. Set up the Solver spreadsheet model for the problem above. Use Solver to solve the problem, obtain the relevant reports and interpret your answer. (40 points). C. Support that each of the four partners has only 160 hours of time available in the coming month. Assume that more than one partner can work on a project. What assignment schedule will maximize the sum of the assigned quality scores? As in Part A, develop and write down the formal mathematical statement of the problem. (50 points) D. Set up the Solver spreadsheet model for the problem in Part C. Use Solver to solve the problem in Part C, obtain the relevant reports and interpret your answer. (50 points) E. Suppose that Chuck does not want to assign multiple partners to the same project but is willing to provide an incentive for each partner to work the overtime needed. Based on the solutions obtained in Parts B and D, develop a comparison of the quality levels of the projects that are delivered. Assuming that a point of increased project quality is worth $1,000 to him, what should he be willing to pay for the quality maximizing solution? (200 points).

   Related Questions in Microeconomics

  • Q : Average cost per unit of production

    When Prohibition Corporation maximizes profit within its production of St. Valentine’s Day software, there average cost per unit of it produced will be roughly: (i) $4 per copy. (ii) $10 per copy. (iii) $18 per copy. (iv) $24 per copy. (v) $32 per copy.

  • Q : Problem on competitive equilibrium of

    The economy consists of two consumers, A and B. Both consumers are endowed with one unit of good 1 and one unit of good 2. Consumer A is entirely indifferent between all consumption plans. Consumer B has the utility function u(xB1 ; xB

  • Q : Income and Substitution effects problem

    Economists decompose how the consumers react to a change in price of a good into the: (1) Diminishing marginal utility effect and indifference effect. (2) Indifference effect and enhancement effect. (3) Net utility effect and preference effect. (4) Income effect and s

  • Q : Oligopolistic pricing behavior

    Collusive oligopolistic pricing behavior: (1) leads to natural monopoly when only some firms dominate an industry. (2) entails overt agreement among many firms in setting outputs and prices. (3) arises while contestable firms simultaneously raise or l

  • Q : Elasticity of supply when price hike

    When a $5 price hike raises the number of tanks of dehydrated water supplied in this market from point e to point f, the elasticity of supply: (i) 2.333. (ii) 2.000. (iii) 1.667. (iv) 1.333. (v) 0.600. How can I so

  • Q : Short-run shutdown price The short-run

    The short-run shutdown price arises where price: (w) equals AFC at the minimum. (x) is below ATC and above AVC. (y) equals AVC at its minimum point. (z) is above MR. Hey friends please give your opinion for the pro

  • Q : Wage Rate and Exploitation problem

    Assume that a firm possessesing both monopsony power as the employer and market power in its output market, however that can neither wage neither discriminate nor price discriminate. In equilibrium, in its labor market for workers, of the given variables the lowest va

  • Q : State the meaning of Inflationary Gap

    State the meaning of Inflationary Gap: This refers to the amount by which the real aggregate demand exceeds the level of aggregate demand needed to establish full employment equilibrium.

  • Q : What is production function Production

    Production function: It is the technological relationship among input and output of a firm and is termed as production function.

  • Q : Process of Screening Can someone help

    Can someone help me in finding out the right answer from the given options. The principal who observes the qualifications of a potential agent prior to offering the agent a contract is engaging in the procedure of: (1) Signaling. (2) Finding out an efficient wage. (3)