Write a high-level dr-bc plan process that would be included


Assignment- Drotos Engineering: Disaster Recovery And Business Continuity

The Drotos Engineering cloud migration project is proceeding. Your applications require a 99.9% uptime. You are now working on the disaster recovery and business continuity plan to ensure that occurs.

Senior wants to be assured Drotos Engineering is prepared to handle any disaster or business interruptions. Therefore, you decide to prepare a summary of your plan and a sample procedure from your disaster recovery and business continuity (DR/BC) plan to review together.

Part 1

Write a 3-page summary in Microsoft Word of your DR/BC plan that includes:

• An overview of your patch management strategy to ensure your systems and applications are up-to-date

• An overview of your backup strategy to ensure applications and all company data is available, including:

o A schedule or plan for full and incremental backups
o The planned use of automated tools

• The types of disasters and potential causes of business interruption covered by your plan

Part 2

Select an event covered by your DR/BC plan.

Write a high-level DR/BC plan process that would be included in your DR/BC playbook for this event.

• Use the DR/BC Playbook Procedure Template to document your processes.
• Each process should be no longer than one page. Outline the DR approach on one page and the BC approach on the second.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Attachment:- Playbook-Template.rar

Solution Preview :

Prepared by a verified Expert
Management Information Sys: Write a high-level dr-bc plan process that would be included
Reference No:- TGS02948596

Now Priced at $45 (50% Discount)

Recommended (94%)

Rated (4.6/5)