Why was a risk management plan considered unnecessary


Assignment: Altex Corporation

Length: 4 to 5 pages.

Read Case: Altex Corporation in the case study section of your text. Write a summary of the case and answer the following questions from the end of the case.

i. Why was a risk management plan considered unnecessary?

ii. Should risk management planning be performed in the proposal stage or after contract award, assuming that it must be done?

iii. Does the customer have the right to expect the contractor to perform risk analysis and develop a risk management plan if it is not called out as part of the contractual statement of work?

iv. Would Altex have been more interested in developing a risk management plan if the project were funded entirely from within?

v. How might the Army have responded if they were presented with a risk management plan early during the R&D activities?

vi. Can risk management planning be justified on almost all programs and projects?

Format your assignment according to the following formatting requirements:

i) The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.

ii) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

iii) Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.

Request for Solution File

Ask an Expert for Answer!!
Risk Management: Why was a risk management plan considered unnecessary
Reference No:- TGS03064125

Expected delivery within 24 Hours