Discussion Post: Country Code and OTR Cycle Time for Software Systems

Use the date in table above and answer the following questions in the space provided below:

• Does the OTR time appear to be stable? Why or why not?

• If you were to use a control chart to evaluate stability, which chart would you use? Why?

• What can you learn about the distribution of the installation process?

• Does it appear that the country has an impact on installation time? Why or why not?

The response must include a reference list. Using one-inch margins, double-space, Times New Roman 12 pnt font and APA style of writing and citations.