What is importance of developing a wbs to manage a project


Assignment: Project Schedule

Write a 1,050- to 1,400-word paper in which you answer the following questions:

• What differentiates a list of project requirements from a work breakdown structure (WBS)?
• What is the importance of developing a WBS to manage a project?
• How does the WBS contribute to the success of a project?
• Once the project schedule is finalized, what are the tools you can use to monitor the schedule?
• How do you handle resource overallocation?
• What are the advantages and disadvantages of fast-tracking a project?

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: What is importance of developing a wbs to manage a project
Reference No:- TGS02983424

Now Priced at $40 (50% Discount)

Recommended (92%)

Rated (4.4/5)