Training phase of the system implementation


Discuss below:

First, you will work on the user training phase of the system implementation, considering the following:

• Planning for training

• Contents of training

• Methods of training

• Location of training

• Schedule of training

• Resources needed

• Training the trainer

• Conducting the training

• Additional periodic ongoing trainings

• Computer-assisted training

Complete the section in a 3-5-page.

Second, this week is final phase of the system implementation that results in the acceptance, rejection, or modification of the project, and release, suspension, or deduction of the contracted amount to the vendor(s)-system maintenance. Create a brief (2-page) summary of how you will:

• Ensure that all hardware work together.

• Ensure that every function of every application of the computer system works and the system meets the functional requirements and the RFP specifications.

• Ensure that data between different systems interfaces and is transferred smoothly and in correct format.

• Ensure correct transference of data from old to new system (conversion testing).

• Ensure that the system can work under maximum load (volume/stress testing).

• Verify that the system works as expected in a live environment.

Solution Preview :

Prepared by a verified Expert
Other Management: Training phase of the system implementation
Reference No:- TGS01795796

Now Priced at $40 (50% Discount)

Recommended (94%)

Rated (4.6/5)