Recommend two best practices concerning project closure


Assignment: Controlling Project Performance And Project Closure

Develop a three to five page paper that addresses the following:

• Illustrate two advantages and two challenges associated with fast tracking and provide examples based on your own experience (not examples from the text).

• Discuss both what it means and possible causes for a project with a CPI of 1.2 and an SPI of 0.8 (include hypothetical figures for PV, AC, and EV in your discussion).

• Discuss the benefit of effective project closure using examples to support your answer.

• Recommend two best practices concerning project closure that would apply to almost any project.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Recommend two best practices concerning project closure
Reference No:- TGS02954638

Now Priced at $40 (50% Discount)

Recommended (96%)

Rated (4.8/5)