Project priority matrix for the conveyor belt project


Project Description:

1. New computer-controlled Conveyor Belt Project

2. The Conveyor Belt Project should move and position items on the conveyor within < 1 millimeter

3. This new project will produce new system for future installations and for replacement of those in the field, at a low cost

4. The computer-controlled conveyor belt has the potential to be a critical unit in 30% of the systems installed in factories

5. The new system is also easier to update with future technologies

The project Priority Matrix for the Conveyor Belt Project (CBP) is:

 

Time

Scope

Cost

Constrain

X

 

 

Enhance

 

X

 

Accept

 

 

X