There are three tasks to do. First, you will work on the user trainingphase of the system implementation, considering the following:

Planning for training

Contents of training

Methods of training

Location of training

Schedule of training

Resources needed

Training the trainer

Conducting the training

Additional periodic ongoing trainings

Computer-assisted training

Complete the section in a 3-5-page.

Second, final phase of the system implementation that results in the acceptance, rejection, or modification of the project, and release, suspension, or deduction of the contracted amount to the vendor(s)-system maintenance. Compose a brief (2-page) summary of how you will:

Ensure that all hardware work together.

Ensure that every function of every application of the computer system works and the system meets the functional requirements and the RFP specifications.

Ensure that data between different systems interfaces and is transferred smoothly and in correct format.

Ensure correct transference of data from old to new system (conversion testing).

Ensure that the system can work under maximum load (volume/stress testing).

Verify that the system works as expected in a live environment.

Request for Solution File