How much work is done by tension


An 8.4 kg crate is pulled 4.8 m up a 30° incline by a rope angled 18° above the incline. The tension in the rope is 125 N, and the crate's coefficient of kinetic friction on the incline is 0.25.

a) How much work is done by tension, by gravity, and by the normal force?

b) What is the increase in thermal energy of the crate and incline?

Request for Solution File

Ask an Expert for Answer!!
Physics: How much work is done by tension
Reference No:- TGS0752392

Expected delivery within 24 Hours