How global construction companies are coping with project


Assignment

Title: Analyzing the project delay causes and how global construction companies are coping with it.

Contents:

1. Cover Page

2. Abstract

3. Introduction - Actual objective introduction regarding project delay causes.

4. Project Related Delays - Discuss below phases with clear description of each factor and their corresponding examples (specific examples for each issue).

a. Planning Phase

• Scope Change
• Design Errors
• Complexity

b. Build Phase

• Contracting
• Procurement

c. Final Phase

• Post Execution

5. Construction Project Related Delays - An overview on construction project related delays and cover the topics below with clear description of each delay cause, their corresponding examples again (specific examples for each issue) and how the global companies are dealing with the delays.

a. Resources Related

• Owner Related Delays
• Consultant Related Delays
• Contractor Related Delays
• Material Related Delays
• Labor and Equipment Related Delays

b. Project Related

c. External Factor Related

6. Conclusion

7. References.

Format your assignment according to the following formatting requirements:

1. The answer should be 15 pagesw, typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

References available

1. Marzouk, M. M., & El-Rasas, T. I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of Advanced Research, 5(1), 49-55. doi:10.1016/j.jare.2012.11.005.

2. Ahmed, Twana. (2015). Delay in Construction Project, 14-15.

3. Five Causes of Project Delay and Cost Overrun, and Their Mitigation Measures. (n.d.).

Attachment:- PMPPT.rar

Request for Solution File

Ask an Expert for Answer!!
Project Management: How global construction companies are coping with project
Reference No:- TGS02974030

Expected delivery within 24 Hours