Expected number of machine failures


14 machines are planned to be used for a 60-day production run for a customer. The operating time is 1660 hours. Upon failure, a machine must be returned to the manufacturer for repair. The turnaround time is at least 90 days and an average of 120 days. The per machine failure rate is 0.01 failures per operating hour.

a. What is the expected number of machine failures during the production run?

b. Determine the number of spare machines required so that the probability of exceeding this number is 10%?

c. What is the probability that the number of spare machines required will exceed the expected number?

Request for Solution File

Ask an Expert for Answer!!
Basic Statistics: Expected number of machine failures
Reference No:- TGS0723726

Expected delivery within 24 Hours