Draw the product structure tree with low level coding draw


An MRP exercise is being implemented over an 8 - week period and the following relevant information is provided: One (1) unit of A is mad e of two (2) units of B and three (3) units of C . One (1) unit of B is made up of three (3) units of D and two (2) units of E. One(1) unit of C is made up of two (2) units of B and two (2) units of D. Items A, C and E have one (1) week lead time. Items B and D have lead times of two (2) weeks. Assume that lot - for - lot (L4L) lot sizing is use d for Items A, C and E and a lot size of 100 is used for items B and D. Items A and D have beginning inventories of twenty (20) and forty ( 40) units respectively; all other items have zero beginning inventory. We are scheduled to receive ten (10) units of item B in week two (2) and twenty (20) units of item D in week one (1). There are no other scheduled receipts.

a. Draw the product structure tree with low level coding .

b. Draw the corresponding time - phased diagram showing lead times to scale.

c. If fifty (50 ) units of A are required in Week eight (8) , determine the necessary planned order releases for all components { five(5) schedules}

Request for Solution File

Ask an Expert for Answer!!
HR Management: Draw the product structure tree with low level coding draw
Reference No:- TGS02920278

Expected delivery within 24 Hours