Discuss some ways for building contingency


Discussion Post: Roll-Out Schedule Resilience

A project implementation plan, or roll-out schedule, must identify the tasks to be done, the order they need to be done in, and who is responsible for doing each of them. However, in real life, schedules often fall behind what is planned.

Respond to the following in a minimum of 175 words:

o Discuss some ways for building contingency and resilience into a roll-out schedule.

The response should include a reference list. Using double-space, Times New Roman 12 pnt font, one-inch margins, and APA style of writing and citations.

Solution Preview :

Prepared by a verified Expert
Computer Engineering: Discuss some ways for building contingency
Reference No:- TGS03142343

Now Priced at $25 (50% Discount)

Recommended (91%)

Rated (4.3/5)