This is the fourth in a series of five sequential homework (the course project) in which you continue to act as the Chief Technology Officer (CTO) of a hypothetical, e-commerce start-up company of your design.

You have been working on delivering an information technology project plan in anticipation of the company relocating to a new facility.

A. In the first course project deliverable, you created a project plan inception document and supporting Gantt chart.

B. In the second course project deliverable, you developed the business requirements to be incorporated into the information systems design you are creating. You also updated your original supporting Gantt chart based on major and minor tasks identified in the business requirements document.

C. In the third course project deliverable, you created an infrastructure design that considered the key elements of software, hardware, security, and business process flow for your e-commerce startup company. Once again, you updated your supporting Gantt chart to reflect the major and minor tasks uncovered while developing the infrastructure design.

This fourth course project deliverable focuses on the project's construction phase. In this homework, you will develop the system implementation plan document. This document will include the engineering, furnishing, and installation (EFI) technical aspects of your e-commerce company's information systems infrastructure. This homework consists of two parts:

You are to write an 8 to 10 pages system implementation document in which you:

• Use graphical tools to design the logical and physical layout of the planned e-commerce company's information systems.

• Use graphical tools to illustrate the possible placement of key infrastructure elements with external connectivity (Internet) and internal connectivity (firewalls, LAN).

• Develop the bill of materials and tabulate it in a spreadsheet to include item, description, model number, and approximate cost.

• Document the methodology and process to include the engineering, furnishing, and installation of the identified inventory.

Format your homework according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the homework, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Computer Engineering: Develop the bill of materials and tabulate it in spreadsheet
Reference No:- TGS03132235

Now Priced at $60 (50% Discount)

Recommended (93%)

Rated (4.5/5)