Develop a scenario where you are a project manager


Assignment: Conflicting Objectives

Length: 3-5 Pages.

Develop a scenario where you are a project manager and have the option of accepting 3 different projects. Utilize an unweighted factor scoring model to analyze which project you should accept. Develop between 5-7 items to be evaluated for each of the projects.

In a paper of 3-5 pages, discuss each project, and provide a basic background for each; then, present a chart detailing the relevant factors to be analyzed using the unweighted factor scoring model. Finally, discuss which project was chosen based on the quantitative and qualitative data provided and explain why.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Develop a scenario where you are a project manager
Reference No:- TGS02986817

Now Priced at $50 (50% Discount)

Recommended (95%)

Rated (4.7/5)