Determine the standard cost per faucet for direct material


Best Faucet Company manufactures faucets in a small manufacturing facility. The faucets are made from zinc. Manufacturing has 40 employees. Each employee presently provides 32 hours of labor per week. Information about a production week is as follows:

Standard wage per hour $12.60
Standard labor time per faucet 10 min.
Standard number of lbs. of zinc 1.4 lbs.
Standard price per lb. of zinc $13.00
Actual price per lb. of zinc $13.25
Actual lbs. of zinc used during the week 9,900 lbs.
Number of faucets produced during the week 6,900
Actual wage per hour $13.00
Actual hours per week 1,280 hrs.

Required:

a. Determine the standard cost per faucet for direct materials and direct labor. Round the cost per unit to two decimal places.

Direct materials standard cost per faucet $
Direct labor standard cost per faucet $
Total standard cost per faucet $

b. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Price variance $
Quantity variance $
Total direct materials cost variance $

c. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Rate variance $
Time variance $
Total direct labor cost variance

Request for Solution File

Ask an Expert for Answer!!
Accounting Basics: Determine the standard cost per faucet for direct material
Reference No:- TGS0696211

Expected delivery within 24 Hours