Determine the net work done on the load


A 215 kg load is lifted 16.0 m vertically with an acceleration a=0.105g (.105 of gravity) by a single cable.

a) Determine the tension in the cable

b) Determine the net work done on the load.

c) Determine the work done by the cable on the load.

d) Determine the work done by gravity on the load.

e) Determine the final speed of the load assuming it started from rest.

Request for Solution File

Ask an Expert for Answer!!
Physics: Determine the net work done on the load
Reference No:- TGS0143596

Expected delivery within 24 Hours