Determine the average total cost schedules


Problem: Kitchen Helper Company decides to produce and sell food blenders and is considering three different types of production facilities (“plants”). Plant A is a labor-intensive facility, employing relatively little specialized capital equipment. Plant B is a semi-automated facility that would employ less labor than A but would also have higher capital equipment costs. Plant C is completely automated facility using much more high-cost, high-technology capital equipment and even less labor than B. Information about the operating costs and production capacities of these three different types of plants is shown in the following table.

                                                              Plant Type

                                            A                      B                    C

Unit variable costs

Materials                               $3.50               $3.25             $3.00

Labor                                     4.50                 3.25               2.00

Overhead                               1.00                 1.50               2.00

Total                                      $9.00               $8.00              $7.00

Annual fixed costs

Depreciation                            $60,000         $100,000        $200,000

Capital                                     30,000            50,000           100,000

Overhead                                 60,000          100,000          150,000

Total                                        $150,000       $250,000        $450,000

Annual capacity                         75,000          150,000          350,000


(a) Determine the average total cost schedules for each plant type for annual outputs of 25,000, 50,000, 75,000, …,350,000. For output levels beyond the capacity of a given plant, assume that multiple plants of the same type are built. For example, to produce 200,000 units with Plant A, three of these plants would be built.

b) Which plant size will Kitchen Helper use at each level of output?

Solution Preview :

Prepared by a verified Expert
Microeconomics: Determine the average total cost schedules
Reference No:- TGS01749874

Now Priced at $25 (50% Discount)

Recommended (92%)

Rated (4.4/5)