This  information is gathered for a project to install a new machine lathe at Diamond Manufacturing Inc:

Activity              Time                       Immediate Result

A                         4                                    ---

B                          7                                   A

C                          9                                   B

D                          3                                   B

E                         14                                   D

F                         10                                 C,D

G                        11                                 F,E

Show the network diagram.

Calculate the slack for each activity and determine the critical path. How long will the project take?

Solution Preview :

Prepared by a verified Expert
Operation Management: Calculate the slack for each activity and determine the
Reference No:- TGS02835029

Now Priced at $10 (50% Discount)

Recommended (97%)

Rated (4.9/5)