Calculate the npv for both conveyor bet systems negative


Hagar Industrial Systems Company (HISC) is trying to decide between two different conveyor belt systems. System A costs $290,000, has a four-year life, and requires $85,000 in pretax annual operating costs. System B costs $405,000, has a six-year life, and requires $75,000 in pretax annual operating costs. Both systems are to be depreciated straight-line to zero over their lives and will have zero salvage value. Whichever system is chosen, it will not be replaced when it wears out. The tax rate is 34 percent and the discount rate is 11 percent.
Calculate the NPV for both conveyor bet systems.( Negative amounts should be indicated by minus sign. Do not round intermediate calculations and round your answer to 2 decimal places. (e.g.. 32.16)

System A NVP $............
System B NVP$..............

Which system should the firm choose?
System A? or
System B? 

Request for Solution File

Ask an Expert for Answer!!
Finance Basics: Calculate the npv for both conveyor bet systems negative
Reference No:- TGS01000375

Expected delivery within 24 Hours