Analysis of estimated overhead costs


Major Instrument, Inc. manufactures two products: missile range instruments and space pressure gauges. During April, 47 range instruments and 303 pressure gauges were produced, and overhead costs of $88,867 were estimated. An analysis of estimated overhead costs reveals the following activities.