Top-Down Integration

Illustrate the problems which might be encountered when Top-Down Integration is selected?

E

Expert

Verified

a) Delay is test till stubs substitute with real modules.

b) Builds up stubs which execute limited functions which simulate the real module.

c) Integrate the software from bottom of the hierarchy to upward.

   Related Questions in Software Engineering

©TutorsGlobe All rights reserved 2022-2023.